ART

Completed Products

Customer : MPKP

Description

The ART system along with the waste collection site has been completed and installed in Jitra, Bandar Darul Aman
(in front of Domino’s Pizza).

Customer : MPM

Description

The waste collection site along with the ART End Culvert has been completed and installed at Phase 2, Jalan SM 2A/14, next to the Baiti Jannati Childcare Center.

Customer : MPM

Description

The waste collection site and ART have been completed and installed at Taman Sri Bayu, behind Sekolah Wawasan. The image at the bottom right shows the waste trapped inside the ART.

Customer : MPT

Description

The waste collection site and the End Culvert type ART have been completed and installed within the ‘Pusat Sembelihan’ area, Jalan Tupai.

Customer : MPT

Description

The waste collection site and the End Culvert type ART have been completed and installed within the ‘Pusat Sembelihan’ area, Jalan Tupai.

Customer : MPT

Description

The waste collection site and ART have been installed in front of the ‘Pusat Sembelihan Jalan Tupai’.

Customer : MPT

Description

The inline ART type and waste collection site have been installed in the drain in front of the ‘Jabatan Perkhidmatan Bandar (Unit Vektor)’.

Customer : MPKK 2

Description

ART has been installed at Taman Kuchai. The picture on the right shows trash trapped inside the ART.

Customer : MPKK 2

Description

ART has been installed at Taman Mutiara(C). The picture shows trash trapped inside the ART.

Customer : MPKK 2

Description

ART has been installed at Taman Mutiara(D).

Customer : MPKK 2

Description

ART has been installed at Taman Seladang. The picture shows trash trapped inside the ART.

Customer : MBMB

Description

ART of the End culvert type has been installed at the drainage on Jalan Bunga Raya, Melaka.